Primary Election Results from 8/11/20

435 registered voters at 7:00 am 8 new voter registrations Ballots Cast 108 Voter turnout 23% Rep US SenatorJohn Berman 6Cynthia Hall 2Bob Carney 4James Reibestein 3Jason Lewis 18 Rep US RepresentativePete Stauber 32Harry Welty 1 Rep State SenatorJohn Moren 29 DFL US SenatorSteve Carlson 9Christopher Seymore 0Tina Smith 59Ahmad Hassan 1Paula Overby 4 DFL […]

Read More

Minutes of the July 7, 2020 meeting

The meeting was called to order at 7:00 pm. The minutes of the June meeting were read and approved. The Treasurer’s Report was approved as read. Fire ReportThere were 4 Fire calls and 11 EMS call in June. Roads– Gravel was placed on Luna Lake Road and Jaranson Road.– A motion was made, seconded and […]

Read More

Upcoming Deer Hunt Information for Side Lake

Here are the dates for the various deer hunts in the Side Lake area: Park Muzzleloader Hunt – 11/28/20 – 12/6/2020, 15 hunters with a 2 bag limit. *Hunters must refrain from parking along the roadway and are encouraged to walk in from the Pickerel Lake parking area. Township Hunt – 10/25/20 – 11/8/20 *Special […]

Read More

PUBLIC HEARING – REQUEST FOR COMMENTS

No Wake Designation Proposed Slow-No Wake Designation for Sturgeon River between Little Sturgeon and Side Lake. Slow-no wake speed means the slowest possible speed to maintain steerage, but no greater than 5 mph. PUBLIC HEARING DATE is schedule for TUESDAY, JULY 28 at 6:00pm at the SIDE LAKE COMMUNITY CENTER PAVILION Information regarding water levels/control […]

Read More

Minutes of the June 2, 2020 meeting

The meeting was called to order at 7:00 pm. The minutes of the May meeting were read and approved. The Treasurer’s Report was approved as read. Fire ReportThere were 4 Fire calls and 6 EMS call in May.8 SCBA masks are needed. Roads Magnesium chloride was placed on all Township Roads. Gravel is needed on […]

Read More

CSAH 5 County Bridge 634 (Riverside Bridge) Project

St. Louis County Public Works has scheduled a 2020 bridge reconstruction project located on CSAH 5, crossing over Sturgeon River and approximately 200’ south of Riverside Inn in Side Lake, MN. Reconstruction of the bridge is expected to begin August 3 rd , 2020. CSAH 5 will be closed to through traffic during construction operations, […]

Read More